2018/12/03 - DRIVE TRAIN INSTALLATION, SWEEPER DESIGN, MOUNTING FRONT MOTORS

The whole robotics team took photos for our website. Lily made a beautiful two-column web page for our team section on the website. Each member of the team has his/hr photo along with a bio.

Meanwhile, the building team weighed the robot and did a field test. This is a crucial step in our building process since we don't want the robot to be too heavy to lift itself. That would be embarrassing.

Finally, I finished our team video.